Description: The 2024 Paving and Drainage Project, C2402 included the following roadways: portions of Northwoods Blvd., Ski Slope Way, and Donner Pass Road; School Street, Manchester Drive., Chelmsford Cir., Berkshire Cir., Wellington Way, Canterbury Lane, Lance Drive, Oxford Cir., and Courtenay Lane. In addition to roadway work several trails were resurfaced, these included: portions of the Legacy Trail, Brockway Road Trail, and the South Gray's Crossing Loop Trail.
Budget: $5.2 Million
Funding: Measure V and Measure R Funds, Tahoe Donner Truckee Special Service Area 1 (TSSA), Glenshire TSSA, Road Maintenance Reserve Funds,
Project Manager: Slater Stewart, Assistant Engineer